Property, Plant and Equipment Accounting Policy
Property, Plant, Equipment and Development Costs
Property, plant, equipment and development costs are carried at cost. Mineral exploration costs, as well as drilling and other costs incurred for the purpose of converting mineral resources to proven and probable reserves or identifying new mineral resources at development or production stage properties, are charged to expense as incurred. Development costs are capitalized beginning after proven and probable reserves have been established. Development costs include costs incurred resulting from mine pre-production activities undertaken to gain access to proven and probable reserves including shafts, adits, drifts, ramps, permanent excavations, infrastructure and removal of overburden. Additionally, interest expense allocable to the cost of developing mining properties and to constructing new facilities is capitalized until assets are ready for their intended use.
Expenditures for replacements and improvements are capitalized. Costs related to periodic scheduled maintenance (i.e., turnarounds) are expensed as incurred. Depreciation for mining and milling life-of-mine assets, infrastructure and other common costs is determined using the unit-of-production method based on total estimated recoverable proven and probable copper reserves (for primary copper mines) and proven and probable molybdenum reserves (for primary molybdenum mines). Development costs and acquisition costs for proven and probable reserves that relate to a specific ore body are depreciated using the unit-of-production method based on estimated recoverable proven and probable reserves for the ore body benefited. Depreciation, depletion and amortization using the unit-of-production method is recorded upon extraction of the recoverable copper or molybdenum from the ore body, at which time it is allocated to inventory cost and then included as a component of cost of goods sold. Other assets are depreciated on a straight-line basis over estimated useful lives of up to 30 years for buildings and three to 20 years for machinery and equipment, and mobile equipment.
Included in property, plant, equipment and development costs is value beyond proven and probable reserves (VBPP) primarily resulting from FCX's acquisition of FMC in 2007. The concept of VBPP has been interpreted differently by different mining companies. FCX's VBPP is attributable to (i) mineralized material, which includes measured and indicated amounts, that FCX believes could be brought into production with the establishment or modification of required permits and should market conditions and technical assessments warrant, (ii) inferred mineral resources and (iii) exploration potential, as further defined below.
Mineralized material is a mineralized body that has been delineated by appropriately spaced drilling and/or underground sampling to support reported tonnage and average grade of minerals. Such a deposit does not qualify as proven and probable reserves until legal and economic feasibility are confirmed based upon a comprehensive evaluation of development costs, unit costs, grades, recoveries and other material factors. Inferred mineral resources are that part of a mineral resource for which the overall tonnages, grades and mineral contents can be estimated with a reasonable level of confidence based on geological evidence and apparent geological and grade continuity after applying economic parameters. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource. Exploration potential is the estimated value of potential mineral deposits that FCX has the legal right to access. The value assigned to exploration potential was determined by interpreting the known exploration information and exploration results, including geological data and/or geological information, that were available as of the acquisition date.
Carrying amounts assigned to VBPP are not charged to expense until the VBPP becomes associated with additional proven and probable reserves and the reserves are produced or the VBPP is determined to be impaired. Additions to proven and probable reserves for properties with VBPP will carry with them the value assigned to VBPP at the date acquired, less any impairment amounts.
Source: Freeport-McMoRan Copper & Gold Inc., Annual Report




.

